EMRES Suite
EMRES Suite
·
→ Request a demo

No commitment required

(EU) 2024/1787 · OGMP 2.0 LEVEL 5

EU methane compliance, end to end.

The regulatory traceability layer for European gas network operators — from field measurements to verification-ready reports, on top of your existing tools.

EMRES2 overdue items · 1 leak repair, 1 V&F notificationLBLeslie BakerManager
Gas Operator · 2,480 sites · 21,300 km of networkDashboard
2026 · year to date ▾All sites ▾Data extract (CSV)
ACT NOWOverdue
2items overdue
Leak repair overdue1V&F notification late1Due within 7 days3
Review overdue items →
CAMPAIGNS 2026On track
LDAR Type 2 · sites surveyed1,860 / 2,480
MRV · data collected74%
14 surveys awaiting validationOpen campaigns →
EMISSIONS 2026Year to date
1,284t CH₄ · ≈ 38.3 kt CO₂e
Network 872 tSites 412 t
21,300 km · emission factors appliedSee breakdown →
ANNUAL REPORT 2026Upcoming
87%
80days leftDue 5 Feb 2027 · Art. 12
87% of records with evidence attachedPrepare the report →
Network mapOpen leaks, sized by annualized emission
Open leaksSectionsV&F events
Network map with open leaks sized by flowRecenter© Mapbox © OpenStreetMap
CriticalHighStandardPriority = EMRES indicator, not a regulatory class
To treat firstOverdue first, then nearest deadline
SL-NTH-C318-P01720 kg CH₄/yr
Service connection, PE — Main Street 14
HighOverdue 1 d
PRS-HIL-C012-P011,140 kg CH₄/yr
Regulator flange — Pressure regulating station Hillside
CriticalDue in 2 d
VC-RNG-C087-P02410 kg CH₄/yr
Valve, steel — Valve chamber, North ring main
StandardDue in 9 d
All 146 open leaks →
Hosted in the EU7+ interface languagesMRV · LDAR · V&F in one data modelWorks on top of your existing tools

THE CHALLENGE

Three obligations. Three deadlines.
One platform to cover them all.

1

MRV

Measurement, Reporting & Verification

Source-level quantification and annual reporting (Art. 12). Site-level measurements for operated assets by February 2027.

2

LDAR

Leak Detection & Repair

Component-level survey programmes. Leaks must be repaired immediately; otherwise a new attempt within 5 days and completion within 30 days. Delays must be notified within 12 days.

3

Venting & Flaring

Venting & Flaring Reporting

Event notifications within 48 hours and annual reporting (Art. 16). All flares compliant with a design DRE of at least 99% by February 2026 (Art. 17).

(EU) 2024/1787 · OGMP 2.0 LEVEL 5

One platform engineered for all three.

Together they cover the core operator obligations of Regulation (EU) 2024/1787.

MRV

Measurement, Reporting & Verification

Collect, validate, and report methane emission data in full compliance with EU Methane Regulation and OGMP 2.0 Level 4/5.

→ Explore module
LDAR

Leak Detection & Repair

Plan, execute, and document LDAR surveys at component level. Integrates OGI, Method 21, and drone-based detection workflows.

→ Explore module
V&F

Venting & Flaring

Track and justify all venting and flaring events with source-level granularity to meet Art. 16 notification and reporting requirements.

→ Explore module
PLATFORM

Three roles.
One record.

Field teams, operators and verifiers work on the same data. What the technician records is what the operator manages, and what the verifier checks.

Field teams & contractorsRecord leaks, measurements and photos on site.
OperatorsTrack every regulatory deadline and prepare the annual report.
VerifiersRead-only access to the evidence behind each figure, for independent verification under Art. 8.
ONE LEAK, THREE VIEWSSL-RIV-C204-P02Service connection, PE — Riverside station
Repaired on time
1
Field technician · detects21 Oct 2026 · 09:42
52 g/h measuredOGI + FID2 photosGPS position
2
Operator · tracks the deadlinesArt. 14(9) and 14(12)
First repair attempt23 Oct · within 5 days
Repair completed14 Nov · within 30 days
Re-check after repairPlanned · before 29 Dec
3
Verifier · checks, read-onlyAnnual report 2026
Full history6 events · 2 usersQuantification methodM1 · version 1.2Frozen report fingerprint3f9a2c…c21e
GET STARTED

Turn methane regulation into a competitive advantage.

Schedule a 30-minute demo and see EMRES Suite handle your actual compliance workflow.

✓ No commitment required·✓ Response within 24h·✓ Support in English, French and Dutch